Inside the Teahouse

July 8th 2003: I'm starting to think about the inside of the teahouse now and have ordered the several sheets of quarter-cut 6mm oak faced plywood for the inside walls.

July 12th 2003: Starting to line the inside walls today with the oak faced plywood that I picked up this morning.

Cutting and fitting the panels to size.

The light switches ready to connect

The 13-amp mains socket fed by an external armoured cable laid
before I started building the Japanese garden!

The front panels nailed in place

Back right-hand corner (this is where the alcove will go)

Back left-hand corner

 Mounting the white shoji blinds

All the panels have been finished with 1/4" quadrant-  all that needs
to be done now is to sand and wax the oak.

Where the alcove will be fitted.

August 9th 2003: I need to build a small fold-away table that I can use for reading or for the computer if need be - only took a couple of days to build and is very simple.

The fold-away worktop in oak

The fold-away worktop in its upright position with the gate leg.

Click here to go to see the teahouse content index