Inside the Teahouse July 8th 2003: I'm starting to think about the inside of the teahouse now and have ordered the several sheets of quarter-cut 6mm oak faced plywood for the inside walls. July 12th 2003: Starting to line the inside walls today with the oak faced plywood that I picked up this morning.
Cutting and fitting the panels to size.
The light switches ready to connect
The 13-amp mains socket fed by an external armoured cable laid
The front panels nailed in place
Back right-hand corner (this is where the alcove will go)
Back left-hand corner
Mounting the white shoji blinds
All the panels have been finished with 1/4" quadrant- all that needs
Where the alcove will be fitted. August 9th 2003: I need to build a small fold-away table that I can use for reading or for the computer if need be - only took a couple of days to build and is very simple.
The fold-away worktop in oak
The fold-away worktop in its upright position with the gate leg. Click here to go to see the teahouse content index
|